Erath County New Systems

Build sequence for a new system

HOUSETANKFIELDWELL
Not to scale. Real setbacks come from your design and the county.

1. Before you close on land

If the land isn't bought yet, ask the seller whether a soil evaluation has ever been done. Pull the tract up in the USDA Web Soil Survey. It won't approve anything, but it shows whether you're likely looking at a standard field or something engineered.

2. Soil evaluation and design

An evaluator records the soil where the system would go. A designer then sizes the tank and disposal area for the home's bedroom count and lays out setbacks to the well, property lines, and any water.

3. County permit

Erath County Environmental Health (100 W. Washington, Stephenville) reviews and permits on-site sewage systems in the county. State rules are on TCEQ's OSSF permit page.

4. Installation

Plan for the install after rough grading. Keep concrete trucks, trailers and the pad for a shop off the field area. Compaction ruins a field before it's ever used.

5. Inspection, then backfill

The county inspects the open system. Aerobic units need a maintenance contract from day one.